Search This Supplers Products:Rail GrinderRail Track Measurement VehicleRail Grinding Wheel





Paramtents
Reaction Temperature ≥2500°C
Weld Cooling Time ~5–8 minutes (ambient dependent)
Total Welding Cycle ≤25 minutes (including preheating, pouring, mold r
Weld Strength ≥95% of base rail tensile strength
Packging & Delivery
Min Order1 piece
Briefing
Detailed
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.